What drives the cost of multi-site technology standards?
The short answer
Budget multi-site technology standards in separate categories: portfolio assessment, baseline design, site-specific remediation, equipment, rollout coordination and ongoing support. Compare locations by site type and confirmed conditions rather than applying one average price everywhere. Include the work needed to document exceptions and maintain the standards as buildings, products and operating requirements change.
Answered by Jim Mazzarella, CEO & Managing Partner
Separate reusable design from local work
Ask which design and documentation activities are performed once for the portfolio and which must be repeated at each site. Identify unknown cabling, power, access or carrier conditions as allowances requiring confirmation. A standard should make those differences visible; it should not hide them inside an assumed identical per-location price.
Compare a complete rollout budget
- Site survey coverage and the evidence required before final pricing
- Equipment, local remediation, installation travel and access assumptions
- Pilot work, project coordination and acceptance documentation
- Administrative setup, training and transition into recurring support
- Refresh planning, approved exceptions and the process for adding future locations
- Ownership of surplus and retired equipment